Airport Metro Station: Finished product ahead of architectural drawing, tweets Nagpur Metro


    Radhika Dhawad | Sep 9, 2019 22:39

    Concept design and Actual Work: Airport South Station

    The countdown for launch of passenger services across Lokmanya Nagar Metro Station and Sitabuldi Interchange has begun. Over all, more than 80% of physical work has been completed. The various components of Maha Metro Nagpur project are at various levels of completion. Nagpur Metro said, “As we look back at the pace of work and the completed part of the project, we cannot miss the fact that executed project have proved to be ahead of design plan.”

    Concept design and Actual Work

    For a layman, it would be difficult to make out, which of two images posted here, is real. Both pictures appear to be same. But there is a major difference between the two. The concept design of Airport Metro Station is posted above followed by its actual photograph. The station, built on modern architectural design, marches ahead in terms of look vis-à-vis its conceptual design.

    Also read: Nagpur Metro commuters to have prepaid ‘MAHA Card,’ mobile app

    Nagpur Metro tweeted, “Better Than Dream स्वप्नापेक्षा सुंदर Airport Metro Station: The Finished Product is Ahead of Architectural Drawing. कल्पनेतून साकारलेल्या चित्रापेक्षा प्रत्यक्षात उतरलेले सत्य अधिक आकर्षक.”